What a Kitchen Remodel Really Costs in Southern Maine
Real ranges, what moves the number up or down, and what an itemized estimate should actually show you.

There is no average kitchen.
That is the honest starting point, and it is why you will get five different answers from five different contractors. A kitchen is not a product with a sticker price. It is thirty or forty decisions stacked on top of each other, and each one moves the number.
But “it depends” is a useless answer when you are trying to figure out whether this is a $50,000 project or a $150,000 one. So here is how we think about it, and what we would tell you across a kitchen table.
Three levels, three very different numbers
Most of the kitchens we build in Southern Maine fall into one of three buckets.
A refresh, same layout — roughly $30,000 to $60,000. Cabinets, counters, backsplash, lighting, and flooring get replaced. The sink stays where the sink is. Nothing moves, so no plumbing gets rerouted and no walls come down. This is the fastest path to a kitchen that feels new, and for a lot of homes it is genuinely the right call.
A full remodel, same footprint — roughly $60,000 to $110,000. Everything above, plus custom cabinetry built for your space instead of ordered from a catalog, better surfaces, upgraded appliances, and real attention to lighting and storage. The room keeps its shape but stops feeling like a compromise.
A full remodel with layout changes — $110,000 and up. Walls move. The island lands where you actually want it. Plumbing and electrical get rerouted, and sometimes structural work comes into it. This is the tier where a kitchen stops being a room you tolerate and becomes the room the house is organized around — and the tier where the cost is driven as much by what is behind the walls as what goes on them.
Where the money actually goes
People are often surprised by the split. Roughly:
Cabinetry — about a third of the budget. The single biggest line, and the one with the widest range. Stock, semi-custom, and fully custom are three different price worlds.
Labor — about a quarter. Demolition, framing, install, tile, finish work. This is the part that separates a kitchen that looks good on day one from one that still looks good in year ten.
Counters and surfaces — roughly 10 to 15%. Quartz, granite, and solid surface all land differently.
Appliances — roughly 10 to 15%, and almost entirely up to you. This is the easiest line to control.
Plumbing, electrical, lighting, flooring, permits, and finishes — the rest.
The reason this matters: when someone tells you they can do your kitchen for half what everyone else quoted, look at the cabinetry line. That is almost always where the difference is hiding.
What actually drives your number up
Moving plumbing or gas. Relocating a sink or range is rarely just one trade.
Taking down a wall. If it is load-bearing, you are adding engineering, a beam, and time.
The age of the house. Older Southern Maine homes are rarely square, rarely level, and rarely wired the way current code wants them. That is not a problem — it is just real work that a newer house does not need.
Custom versus stock cabinetry. The biggest single lever in the whole project.
How long you can live without a kitchen. Phasing a job to keep a family fed costs more than clearing out and working straight through.
What a real estimate should show you
This is the part worth being picky about.
A one-page quote with a single number at the bottom is not an estimate. It is a guess with a signature line. What you should get is an itemized breakdown — cabinetry, counters, tile, fixtures, appliances, labor, permits — so you can see what you are paying for and where you have room to move. When a number is too high, an itemized estimate tells you which decision to revisit. A lump sum tells you nothing.
You should also get an honest schedule, in writing, before anyone starts.
Ours are free, and there is no obligation attached to them.
About surprises
Here is something most contractors will not put in writing: in an older home, you do not know everything until the walls are open.
We have found knob-and-tube wiring behind plaster that looked perfectly fine. Water damage under a floor with no stain on the ceiling below. Framing that someone modified in 1974 and nobody documented. It happens, and any contractor who promises you it will not is telling you what you want to hear.
What we can promise is how we handle it. If we open a wall and find something, you hear about it that day — with photos, with options, and with a number attached to each one. You decide how to proceed. We do not do surprise line items at the end, and we do not quietly absorb problems and then look for them back somewhere else in the budget.
That is the actual difference between a good estimate and a bad one. Not whether anything unexpected turns up. Whether you find out about it standing in your own kitchen, or on the final invoice.
Where to start
If you are trying to figure out what your kitchen would cost, the fastest useful step is not a calculator. It is having someone walk the actual space.
We will come out, look at what you have, talk through what you are picturing and what you want to spend, and follow up with an itemized estimate and an honest timeline. No obligation, no pressure, and no charge.